Walk it before you dig it
Lay out the route with hoses or paint and walk it. Comfortable walking paths are 36–48 inches wide; two people side-by-side need about 60 inches.
PATHWAY CALCULATOR
Pick a surface, enter the run, and get excavation, base, bedding, surface, and edging quantities.
Select how the walking surface is built.
Quantities and the cross-section update automatically.
Pavers: Concrete or brick pavers on sand. Set the finished surface about an inch proud of grade so water sheds off the path.
Common planning considerations for paths and walkways.
Lay out the route with hoses or paint and walk it. Comfortable walking paths are 36–48 inches wide; two people side-by-side need about 60 inches.
Remove sod and organics down to the full build-up depth. Soft spots re-appear as dips in the finished path, so compact or replace them before placing base.
Compact crushed base in 2-inch lifts with a plate compactor. The base, not the surface, determines whether pavers stay flat through seasons.
Crown loose paths or slope hard surfaces about ¼ inch per foot to one side. Never grade a path so it directs water toward a foundation.
Pavers and loose materials migrate without restraint. Snap edging, steel, or timbers hold the field tight; set edging on the compacted base, not on loose soil.
Separation fabric under the base keeps clean stone from mixing into the subgrade on soft or clay soils, preserving depth and drainage over time.
Verify dimensions, drainage, slopes, accessibility requirements, utility locates, and local codes before digging. Bulk material weights vary by supplier and moisture; confirm coverage rates with your yard.